Surely one of the most important issues related to urban law is that of the construction of properties or buildings in non-urbanizable areas, and their homologation to legal legality through the figure of the situation of asmiliation outside the ordinance. In this article we are going to talk about this concept, offering the details and requirements that must be taken into account before requesting it officially.
What is the situation of assimilated out of order
For the Andalusian territory, this concept is addressed in the first additional provision of Law 7/2002 on Urban Planning of Andalusia , which states the following:
First situation of being assimilated to being out of order
1. Irregular buildings that are completed, and for which it is not possible to adopt measures to protect urban planning legality or to restore the disturbed legal order because the period for exercising such measures in accordance with Article 185.1 has expired, will be considered as being in a situation equivalent to being outside of planning regulations. A building will be considered completed when it does not require any material action to serve the use for which it is intended, except for the works that are necessary to guarantee the minimum conditions of safety and health (...).
By carefully reading the article, you can obtain the following requirements to meet, which we develop below:
- Irregular buildings that are finished. It is a regulation that applies to buildings irregular, either because it was not built with the proper administrative permits, because it was carried out on undeveloped or rustic land, and so on. And they must be found finished, not under construction. As long as its construction status is maintained, no limitation period will begin for these purposes and therefore it will be impossible to apply the assimilated to out of order.
- That it is not possible to adopt measures to protect urban legality or to restore the disturbed legal order due to the expiration of the term for its exercise in accordance with article 185.1. What this section means is much simpler than it might seem at first. If we go to article 185.1 of the same Law 7/2002 we will find a term that the administration has in order to exercise its measures against illegal building. Except for some important exceptions, this period will be six years, and once complied with, it will prevent the Town Councils from exercising coercive measures such as financial penalties, demolition orders, and so on.
Then in principle and with the exception of some cases, any irregular property that is completed and whose six-year period to take measures by the administration has ended will be able to benefit from this assimilated regime outside of ordination.
How the assimilated to out-of-ordination situation procedure works.
The procedure isn't particularly complicated, but it does involve several steps that can make it a bit tedious for someone unfamiliar with dealing with municipal planning departments. The first step is to contact a technical expert to prepare a report confirming that the property meets all legal requirements for its use, with the exception of the remediable defect of being built on non-developable, rural, or other applicable land.
If the report is positive, it must be attached to an application submitted by the applicant, which must include documentation proving ownership (a cadastral ownership certificate and deeds will suffice), photocopies of their national identity document, and proof of current utility contracts (water, electricity, gas, etc.). All of this, along with proof of payment of the fee from any financial institution, must be submitted to the Town Hall office, where it will be evaluated by the administration.
Regarding fees , unfortunately each municipality sets its own rates, making it impossible to provide a specific amount. In the case of Málaga, for example, this fee schedule shows two charges: one for the urban planning verification process (€120,00) plus another that depends on the specific type of building to be legalized (Tariff A). Most municipalities are transparent in publishing these fees.
Some exceptions to the situation of assimilated out of order.
There are some exceptions, which we have already briefly mentioned, that deserve to be taken into account due to their importance. These mainly affect illegal buildings to which, by their very nature, no statute of limitations can be applied by the administration. Strictly speaking, they are not subject to any statute of limitations for these purposes. Some examples can be found in Article 185.1 of Law 7/2002, and consist of illegal properties that affect land designated for special protection according to the Urban Development Plan of the territory in question, such as those built in areas designated for roads, highways, or other public works of similar importance; those that affect areas of special environmental protection, such as coastal zones; those dedicated to the construction of parks or gardens; and so on.
Checking whether a specific property is located in this type of zone, or on generally developable or non-developable land, is very simple: it involves reviewing the Urban Development Plan that each municipality is required to make publicly available. Larger municipalities make these plans available online, while smaller municipalities or those with fewer resources must keep them on file at their Planning Department for public consultation.